Project: Admin Building Supply For TNB Sultan Iskandar Johor
Company: Magnitude Power Sdn. Bhd.
Amount: RM 20,140.00
Year: 2016
Project: Perform Short Circuit Analysis & Protection Coordination Study for Gantisan Rehabiltation of 2x20MW LM2500 Gas Turbine at Batu Sapi Power Station, Sandakan, Sabah
Company: Magnitude Power Sdn. Bhd.
Amount: RM 39,750.00
Year: 2017
Project: Perform Harmonic Analysis Due to Variable-Frequency Drive for Mohaz Engineering & Technology (M) Sdn Bhd
Company: Mohaz Engineering & Technology (M) Sdn Bhd
Amount: RM 15,000.00
Year: 2017
Project: Optimal Off-Grid Photovoltaic (OGPV) Design For Fog Horn & Obstruction Light Application For an Offshore Single Buoy Mooring Equipment
Company: ISmartUrus Sdn. Bhd.
Amount: RM 15,900.00
Year: 2018
Project: Power Factor Correction For Eliminating TNB Surcharge
Company: Kedai Kek dan Roti Al-Fayyadh
Amount: RM 1,325.00
Year: 2018
Project: Off-Grid Photovoltaic (OGPV) Design For Project At Chemor, Perak
Company: AHM Technical Support
Amount: RM 5,300.00
Year: 2018
Project: Wifi Expansion For 21st Century Learning Initiative at Sekolah Kebangsaan Taman Impian Emas
Company: SMK Impian Emas
Amount: RM 2,000.00
Year: 2018
Project: Power Distribution Network Design For Radar over Fiber Foreign Object Debris Detection System at Kuala Lumpur International Airport
Company: ISmartUrus Sdn. Bhd
Amount: RM 7,420.00
Year: 2019
Project: Engineering, Procurement, Construction And Commissioning Of Off Grid PV For Navigational Aids Facilities For Single Buoy Mooring (SBM) For Malaysian Refining Company Sdn. Bhd (MRCSB), Melaka
Company: ISmartUrus Sdn. Bhd
Amount: RM 21,200.00
Year: 2019
Project: Optimal Off Grid Photovoltaic Design for Off Grid Off Shore Wave Radar Device
Company: Arus Infiniti Sdn. Bhd.
Amount: RM 35,000.00
Year: 2019
Project: Load Flow And Protection Coordination Verification For Kemaman Bitumen Company Sdn Bhd
Company: TNB Remaco Sdn Bhd.
Amount: RM 32,860.00
Year: 2020
Project: Design Conceptual free or low maintenance substation for Pencawang Elektrik, Sistem suiz utama dan pencawang pambahgian utama
Company: TNB Remaco Sdn Bhd.
Amount: RM 50,000.00
Year: 2020