Research Grant

Reverse Power Flow Solution In Distribution Network Via Reconfiguration Technique

Duration: 2 years (1/12/2012 --  31/12/2014)

Amount: RM 108,532.00

Optimal Hourly Network Reconfiguration Based On Photovoltaic Output In Distribution Network 

Duration: 1 year (1/5/2014 --  30/4/2015)

Amount: RM 20,000.00

Coordinated And Robust Design Of Power System Stabilizers Using Bees Algorithm

Duration: 2 years (1/7/2014 --  30/6/2016)

Amount: RM 88,000.00

Electrochemical Characterization Of Glass Wool As Separator For Supercapacitor

Duration: 2 years (1/12/2014 --  30/11/2016)

Amount: RM 114,000.00

A Self-Configuring Methodology Of Future Smart Power Grid(A Solution Towards Future Potential Challenges)

Duration: 2 years (1/4/2014 --  31/3/2016)

Amount: RM 80,688.79

Flexible Feed in Tariff Scheme for Photovoltaic in Residential Area Based On Artificial Neural Network Projection

Duration: 1 year and 3 months (1/5/2015 -- 31/7/2016)

Amount: RM 20,000.00

Enhancing Power System Oscillation Stability with Facts Devices Using Fuzzy Logic and Bees Algorithm

Duration: 1 year 6 months (1/5/2015 -- 31/10/2016)

Amount: RM 50,000.00

An Efficient Solar Tracking System with Fuzzy Logic Method for Tropical Environment

Duration: 2 years (15/11/2015 -- 14/11/2017)

Amount: RM 50,000.00

Distribution Loss Minimization via Distributed Generation, Capacitor Placement and Network Reconfiguration.

Duration: 1 year (01/02/2016 -- 31/01/2017)

Amount: RM 20,000.00

Passive Filter Size Optimization for Reducing the Harmonic Distortion Due To Electrical Vehicle Charging Station

Duration: 1 year and 6 months (1/10/2016 -- 31/3/2018)

Amount: RM 40,000.00

Flexibility Constrained Unit Commitment Problem for Enhanced Operation of Low Carbon Power Systems By An Enhanced Priority List Based Particle Swarm Optimization Technique

Duration: 2 year (1/7/2016 -- 30/6/2018)

Amount: RM 40,000.00

Adaptive Handover Triggering Via Velocity And Travel Distance Estimations Enhancements

Duration: 1 year (1/10/2016 -- 30/9/2017)

Amount: RM 20,000.00

Pembangunan Garis Panduan Mudah Penyelenggaraan Sistem Solar bagi Masyarakat Orang Asli Kluang

Duration: 9 months (15/07/2016 -- 14/04/2017)

Amount: RM 35,800

Projek Perintis: Pembangunan Eco-Balai Rawatan Di Kampung Orang Asli Pucur, Kluang

Duration: 6 months (1/1/2017 -- 30/6/2017)

Amount: RM 53,000.00

Kelestarian Transformasi Pembangunan Sosio-Ekonomi Penduduk Kampung Sg. Tiang, Hutan Simpan Royal Belum

Duration: 1 year (1/11/2016 -- 31/10/2017)

Amount: RM 64,000.00

Projek Konservasi dan Penjanamaan Durian Kampung Segamat.

Duration: 10 months (15/7/2016 --14/4/2017)

Amount: RM 29,500.00

Pendedahan Terhadap Sistem Tenaga Solar Terasing Dan Teknik Penyelenggaraannya

Duration: 3 months (1/11/2016 --31/1/2017)

Amount: RM 5,000.00

Development Of Combined Ocean Renewable Energy System Prototype (CORES)

Duration: 2 years 6 months (1/7/2015 --31/12/2017)

Amount: RM 272,000.00

Enhanced Power Quality Controller In An Autonomous Microgrid Using Whales Optimization Algorithm

Duration: 1 years (1/7/2017 --31/6/2018)

Amount: RM 40,000.00

A Study And Analysis Of Climate Impact On Stingless Bee (Trigona Itama) Through Internet Of Things (Iot) Applications

Duration: 2 years (1/2/2018 --31/1/2020)

Amount: RM 50,000.00

Non-Intrusive Load Monitoring And Management Of Residential Electrical Appliances Using Steady-State Load Signatures

Duration: 2 years (1/2/2018 --31/1/2020)

Amount: RM 40,500.00

Projek Pemindahan Ilmu Untuk Mencapai Penjimatan & Kecekapan Elektrik Terbaik Dalam Menjamian Kelestarian Kehidupan

Duration: 6 months (01/02/2019 -- 1/07/2019)

Amount: RM 5,000.00

Off Grid Photovoltaic Design And Performance Evaluation For Kampung Orang Asli Woh Intake, Tapah, Perak

Duration: 6 months (12/02/2019 -- 11/02/2020)

Amount: RM 80,000.00

Malaysia-China Research And Cooperation On Marine Renewable Energy Utilization

Duration: 6 months (01/10/2018 -- 30/09/2020)

Amount: RM 471,500.00

Energy Storage Management Scheme for Stand-alone High Penetration Renewable Energy System

Duration: 2 years (01/03/2020 -- 28/02/2022)

Amount: RM 40,000.00

TNB kWh Meter Impulse Signal Evaluation For Nextcenturty Submetering Application

Duration: 4 months (22/07/2020 -- 21/11/2020)

Amount: RM 15,000.00

Improving The Quality Of Life For Fishermen Through The Adaptation Of Solar Through The Adaptation Of Solar PV Technology To Fishing Boats In Mersing

Duration: 1 year 9 months (01/01/2020-- 30/09/2021)

Amount: RM 20,000.00

Pembangunan Sistem Tenaga Solar PV Di Kampung Orang Asli Terakhir Tanpa Bekalan Berterusan Di Johor: Tewowoh, Mersing

Duration: 1 year 9 months (15/03/2021-- 31/12/2022)

Amount: RM 114,200.00

Evaluation Of Photovoltaic String Performance Concerning Rooftop Orientations For Kampung Orang Asli Tewowoh 

Duration: 1 year 6 months (01/06/2021-- 30/11/2022)

Amount: RM 20,000.00

An Effective Energy Management System Scheme Evaluation Considering The Quadrilemma Factors For A Microgrid System Via Metaheuristic Technique 

Duration: 3 years (07/09/2021-- 06/09/2024)

Amount: RM 114,200.00